The following are examples of measures for mitigation for Large Scale Housing Projects and mitigation for Roads and Highways.
Mitigation for Large Scale Housing Projects
The following is an example of mitigation measures for a large scale housing project.
| No. | Potential negative impacts | Mitigating measure |
|---|---|---|
| Direct Impacts | ||
| 1. | Displacement of existing land uses | Ensure that due consideration is given to the proper trade-offs between land values for housing and those of other uses, such as prime farmland, forests or other land uses or natural habitats of value to society as a whole. Investigate existing planning and design standards to ensure that they are suited to local conditions and not unnecessarily wasteful of land. Assist in drafting new regulations that are more appropriate. |
| 2. | Destruction of environmentally critical areas | Ensure that regionally critical environmental sites, such as major forested areas, major water bodies and wetlands, habitats containing rare and endangered species, etc., are identified and not threatened by project location. |
| 3. | Danger to residents from hazardous natural conditions | Ensure that project site is not located in the following areas:
|
| 4. | Danger to residents from hazardous man-made conditions | Identify areas that have significant man-made hazards such as filled land, areas subject to subsidence from mining activity, groundwater, oil or other extractive process.
|
| 5. | Hazard to residents from air, water or noise pollution from other adjacent or nearby land uses | Ensure that the site is located away from such pollution sources.
|
| 6. | Hazard to residents from air pollution due to site location being in an area subject to frequent temperature inversions | Seek alternate site locations if pollution is from existing sources that are difficult to abate.
|
| 7. | Dislocation of existing resident populations | Ensure that any involuntary resettlement is done in accordance with proper standards or consider alternate sites. |
| 8. | Destruction of historic or cultural resources | Consider alternate sites or make provisionto set aside and zone historic and culturally significant areas. |
| 9. | Overloading of existing infrastructure and services | Coordinate with other planning goals and objectives for region.
|
| 10. | Excessive depletion of resources such as lumber or fuel or overtaxing of traditional industries, such as brickmaking | Review capacity of local resources and industries to provide for large-scale construction and upgrade if feasible.
|
| Local and Site Impacts | ||
| 11. | Damage to sites and their immediate surroundings resulting from the disruption of the natural environment, in particular the soil, vegetation and drainage network (see below for more detailed comments). | Identify the basic natural systems of a site and its immediate surroundings and protect with set-asides for open space, easements and buffer areas etc.
|
| 12. | Degradation of habitats caused by fragmentation | Maintain and/or design open space networks to follow natural site features, such as stream corridors, and connect the site and local and regional open space systems. |
| 13. | More extreme flood/drought cycles, increased erosion and siltation and degradation of stream biota and riparian vegetation etc caused by increased runoff from developed sites | Preserve existing vegetation, particularly intact natural habitats.
Use ‘soft engineering’ techniques for soil and bank stabilization such as vegetative stabilization (soil bio-engineering), in preference to built structures. |
| 14. | Depletion and/or pollution of local groundwater resources | Ensure that projected use of groundwater is within the capacity of natural system to replenish itself.
|
| 15. | Degradation of soil cover from erosion, removal, or loss of soil structure due to compaction | Have both temporary (during construction) and permanent erosion control plans.
Permanent erosion control plans should focus on the establishment of stable native vegetation communities.
|
| 16. | Loss or degradation of vegetation from unnecessary removal or mechanical damage | Identify important stands of vegetation, large contiguous stands of forest or other habitat, vegetation on steep slopes, and stream corridors or swales.
|
| 17. | Degradation of habitat from inappropriate management or introduction of invasive exotic species | Protect natural habitat from destructive management or maintenance practices, such as the removal of understorey vegetation from woodlands, or excessive clearance of vegetation from stream banks.
|
Mitigation for Roads and Highways
The following is an example of mitigation measures for a roads and highways.
| No. | Potential negative impacts | Mitigating measure |
|---|---|---|
| Direct Impacts | ||
| 1. | Increased sediment in streams affected by erosion at construction sites and fresh road cuts, fills and waste dumps. | Protect susceptible surfaces with mulch or fabric, and plant non-erodible surfaces as soon as possible. |
| 2. | Soil and water contamination by oil, grease, fuel and paint in equipment yards and asphalt plants. | Collect and recycle lubricants.
|
| 3. | Air pollution from asphalt plants. | Install and operate air pollution control equipment. |
| 4. | Local dust and noise. | Periodically water down or lightly oil temporary roads.
|
| 5. | Air and noise pollution from vehicle operation, in populated areas traversed by the highway, notably metropolitan areas or densely settled rural areas. | Include physical barriers to noise in plans.
|
| 6. | Landscape disfiguration by embankments and deep cuts, fills and quarries. | Use an architectural design to ‘blend’ with the landscape.
|
| 7. | Landslides, slumps, slips and other mass movements in road cuts. | Provide drainage works as needed to reduce risk, according to prior surveys.
|
| 8. | Erosion of lands below the road bed receiving concentrated outflow from covered or open drains. | Increase number of drain outlets.
|
| 9. | Roadside litter. | Provide for disposal facilities.
|
| 10. | Hazardous driving conditions where construction interferes with pre-existing roads. | Provide in design for proper markers on roads, including lights. |
| 11. | Alteration of overland drainage and subsoil drainage (where road cuts intercept perched water tables, springs etc). | Installation of adequate drainage works. |
| 12. | Destruction of vegetation and wildlife in the right-of-way occupied by the highway. | Realignment where possible to detour exceptional areas, identified by prior surveys. |
| 13. | Destruction or damage of terrestrial wildlife habitats, biological resources or ecosystems that should be preserved. | Plan national transportation route alignment to avoid location of fragile, unique, etc areas. |
| 14. | Alteration of hydrological regimes of wetlands by causeways, with harmful effects on these ecosystems. | Realignment to avoid wetlands.
|
| 15. | Interruption of migratory routes for wildlife and livestock.
| Realign to avoid important migratory routes.
|
| 16. | Poor sanitation and solid waste disposal in construction camps and work sites. | Provide adequately located and maintained latrines. |
| 17. | Possible transmission of communicable diseases from workers to local populations and vice-versa. | Periodic health examinations of workers with treatment when needed. |
| 18. | Creation of temporary breeding habitats for mosquito vectors of disease, e.g. sunny, stagnant pools of water. | Assess vector ecology in work areas and take steps where possible to avoid creating habitats. |
| 19. | Creation of transmission corridor for diseases, pests, weeds and other undesirable organisms. | Set up plant and animal sanitation service and related checkpoints. |
| 20. | Poaching by construction workers. | Prohibit poaching under terms of employment. |
| 21. | Dislocation and compulsory resettlement of people living on the right-of-way. (Near cities and in rich farming regions, many people can be affected.) | Locally unprecedented mechanisms and procedures may be required to arrive at equitable and adequate compensation, and a companion effort to develop the capacity may be required. |
| 22. | Obstruction of routes from homes to farms, etc., increasing travel time. | Provide appropriately designed and located crossings. |
| 23. | Impairment of non-motored transportation in the highway corridor due to reduced or impeded rights-of-way. | Design and implement safety measures and an emergency plan to contain damages from accidental spills.
|
| Indirect | ||
| 24. | Induced development: roadside commercial, industrial, residential and ‘urban sprawl’. | Involve land-use planning agencies at all levels in project design and EA and plan for controlled development. |
| 25. | Increased motorized transportation (with possible increased dependency on imported fuels). | Include project components to encourage use of nomotorized transportation. |
| 26. | Impairment of non-motorized transportation economy due to changes in land use and/or increased availability of motorized alternatives. | Include project components to stimulate local production and use of non-motorized modes of transportation. |
References
World Bank (1991) Environmental Assessment Sourcebook (three volumes). Technical Papers Nos. 139, 140 and 154, World Bank, Washington D.C.